Phase 5 Preliminary Engineering has begun.

Posted by Jim Bresnahan on May 4, 2017 at 10:15 PM

With the receipt of a planning grant from the Missouri Department of Natural Resources, Shoreline Surveying and Engineering, LLC will begin the preliminary engineering work on defining Phase 5. Phase 5 will pick up the rest of the original Phase 4 design that was left unfunded. This will enable GASD to begin sourcing funds for this phase while finishing the construction of Phase 4 currently underway.